Robinvale Community Pool

Design Brief

Design and construction of a 33 metre main pool, program pool & toddlers pool within the structure of the existing pools for Robinvale Community Swimming Centre.

The Result

Features include:

  • automatic chemical dosing
  • 2x 11kw circulation pumps
  • 12 square metres of filter area
  • removable disabled lifter installed
  • water feature built into safety rail
  • Fluvo fan water feature for the program pool

 

 

We have a team of Qualified Project Managers in charge of all Construction including OH &S. We comply with the National Code of Construction. Our Supervisors ensure delivery of Quality Assured Products.