Home
About Us
Products/ Services
Maintenance
Projects
News
Links
Testimonials
Contact Us
Image1\

Robinvale Community Pool

Commenced: January 2006

Completed: July 2006

Design Brief
Design and construction of a 33 metre main pool, program pool and tollders pool within the structure of the existing pools for Robinvale Community Swimming Centre.
The Result
Features include:
•  automatic chemical dosing
•  2 x 11kW circulation pumps
•  12 square metres of filter area
•  removable disabled lifter installed
•  water feature built into safety rail
•  Fluvo fan water feature for the program pool.

Download fact sheet here