2008

Bathurst Island

Design Brief

While the Northern Territory Government explored the feasibility of upgrading the Nguiu Swimming Pool on Bathurst Island (north of Darwin), State Wide Pools was commissioned to prepare a Pool Assessment Report.

While the existing pool was only a few years old, certain deficiencies rendered those facilities unsuitable for most of that time.

State Wide Pool Services report consisted of:

a. An overview of systems

b. Analysis of systems and problems including:

  • pool hydraulics
  • plant and equipment
  • necessary repairs and safety concerns

Upon completion of this report, we were contracted to renovate the existing 25-metre pool and toddlers' pool.  These renovations included a complete upgrade of the hydraulics and plant.  For five months TILG provided accommodation for our team in this remote location.  All tools, plant and equipment were trucked to Darwin then ferried across to Bathurst Island.

The Result

The entire project cost $160,000 and as you can see by the photos, the real value lies in what this facility means to the health and enjoyment of the individuals and wider community that use it.

Commenced: November 2007

Completed: March 2008


Urrbrae Agricultural College

Design Brief

While we love building commercial swimming pools from scratch, often what's required is a major refurbishment of existing facilities. After an inspection of Urrbrae Agricultural College's 25 metre outdoor pool, State Wide Pool Services presented a proposal for works which was accepted by the College.

The Urrbrae pool's gutters were removed and replaced with a wet deck system on both sides. These measures enhanced the pool's aesthetics and helped with the conservation of water. Tiles then needed replacing along the pool sides and in other areas where years of wear and tear had taken their toll.

We removed the up-stand on both sides of the pool to provide a wet deck edge. Concrete 'cancer spots' were then treated by exposing the reo bars and treating them with appropriate products. Once again, tiles had to be replaced for this work to be completed.

The Result

Our stainless steel department then fabricated new ladders, expansion joints were resealed, existing starting blocks were replaced with convenient portable starting blocks and with the addition of new lane ropes, Urrbrae's $110,000 pool upgrade was complete.