Tiling

Mutitjulu

Mutitjulu is home to 400 Australians, primarily indigineous and is based only hundreds of metres away from our national icon, Ayers Rock.

ABC Report

Harold Holt Swim Centre

Design Brief

Stonnington City Council were the owners/operators of an ageing, yet popular, inner city pool complex located in the suburb of Glen Iris.  The existing outdoor 50-metre pool and indoor 25-metre pool were both heavily patronised all year round.

State Wide Pool Services were engaged and took up the challenging task of refurbishing the existing facilities and building new pools - all while the centre remained in operation !

The Result

The new hydrotherapy pool, leisure pool, splash deck, indoor spa and outdoor spa stand alongside the refurbished 25-metre and 50-metre pools in a facility which is now regarded as the finest in Melbourne.  State Wide Pool Services proved itself capable of not only outstanding work but also the ability to meet the rigorous timelines and operational restrictions imposed by this demanding project.


Water World

Design Brief

Tea Tree Gully Council own and operate Waterworld, one of South Australia's largest outdoor swimming centres.  Decades old, Waterworld was in need of a makeover.  Attendances had been falling over many years and the cost of maintenance was increasing.

State Wide Pool Services won the contract for a major refurbishment which included:

  • Installation of a new disabled access ramp and wet deck gutters to the existing 50-metre pool

  • New wet deck gutters to the existing 25-metre pool

  • A new splash deck with a range of water toys

  • Waterslide runouts

Of course, these refurbished and new pools needed new tiling, stainless steel fittings, plant, hydraulics and balance tanks.

The Result

The result is a state-of-the-art outdoor swimming centre which could easily be mistaken for a brand new facility.

Quality materials and equipment will result in minimal maintenance and this, combined with huge increases in attendance rates has turned around the financial performance of the centre.

Launceston Aquatic Centre

Design Brief

State Wide Pool Services are very pleased to be involved with the Launceston Regional Aquatic Centre development.  We were contracted to supply and install all Water Treatment and Hydraulic Systems to:

  • Outdoor 25-metre pool, leisure pool and water slides

  • Indoor 50-metre pool, hydrotherapy pool, leisure pool and spa

We designed, supplied and installed Water Features to the indoor and outdoor leisure pools.

The Result

This was a major development in Launceston and now is a first class leisure facility.  It focuses on health and wellbeing for all patrons in the community.

Elizabeth Aquadome

Design Brief

State Wide Pool Services were contracted to undertake pool renovations of the existing 50-metre Leisure pool with beach entry with a new spa.

This renovation of the existing 50-metre pool consisted of removing the old gutter system and replace with a wetdeck system, repair pool control joints, fully re-tile and renovate diving blocks.  We made a stainless steel disability ramp and designed a new water treatment system and pool hydraulics for all pools, spa and waterslide.

The new leisure pool was designed with a warm water zone, exciting new water features such as tipping wheels, fan spray and beach jets to keep the kids interactive in the pool while parents can relax in the new fully tiled spa.

The Result

Elizabeth Aquadome is now a modern Aquatic Centre designed for exercise, fun and relaxation.